Pyongyard building 1600A Electrical Storage (2005)
The leakage of the cable house led to an explosion of 1600A cable. Yat Full immediately looted, applied to the electricity company for 1200A terrain on time, and replaced 1600A terrain.
Four main engineering field cases - nearly five hundred building building power and water pump system maintenance experience
Explore system engineering photographs to learn about Yat Full ' s construction quality and experience. YAT FULL ENGINEERING was established in two years, with a dedicated building of the electricity system (WR2), water pump control system, CCTV and solar energy.

34 Building main switchboard replacement, electrical rising mains replacement, reconfiguration of the appliance box and WR2 inspection test photographs in the field.
Looking at the electricity engineering log
29 Intelligent digital water pump control system installation, water pump system maintenance and maintenance of field photographs.
Looking at water pumps
Building CCTV Monitoring System Planning, Installation, Upgrading and Maintenance, with privately concealed guidance focus and system charts.
Access to CCTV system
10 solar energy PV systems install photographs with feed-in tariff and with a specified focus.
View the solar installation gallery →Electricity systems and water pump control systems have been repaired to more than five hundred buildings
Replacement with electrical rising mains and building main switchboard
Intelligent digital water pump system installed in 2002 and 3 years, no bad machine records have yet been available
Electricity, water pump and solar energy engineering photographs
Emergency repair and replacement of major revolume main switchboard explosions
More than 20 years since its establishment, 24 hours of maintenance services were established at the time of its opening
The electricity system is the core business of Yat Full, with Yat Full from 2002 to 5 years.Repair of the main electrical systemThe following types of work are recorded in the book:
Plans are under way for WR2 flaws, electrical rising mains or main switchboard replacement Owners’ Corporation and property management companies; building owners of building who need to compare the contractor ' s construction quality.
Yat Full has used intelligent digital pump systems since 2003, with immediate identification of fault causes and prompt repairs. Over 500 systems have been installed, with no unit failures recorded to date. This gallery includes:
Household water-stop complaints, pump control panel ageing or Owners’ Corporation and property management requiring a contract for water pump maintenance were frequently received, and the Water Authority recommended that the water tank be cleaned every three months and the water tank behed every six months.
Yat Full provides CCTV system planning and installation for the building industry, covering public corridors, entrances, cars and facilities, and complementsElectricity system installationWork together to reduce the cost of duplicating and coordinating.
The CCTV system page photographs are derived from free graphies for service announcement purposes.
Yat Full provides solar energy systems design and installation, assists in the good use of renewable energy and ensures safe and stable functioning in conjunction with the electricity engineering profession. The page is codified with the feed-in tariff and with a set of priorities:
The leakage of the cable house led to an explosion of 1600A cable. Yat Full immediately looted, applied to the electricity company for 1200A terrain on time, and replaced 1600A terrain.
The leakage of the cable house resulted in an explosion of 2,500A cable. Yat Full was immediately looted and replaced the internal spare parts of the 2500A main switchboard and re-established two buildings.
Together with the electrical rising mains and building main switchboard, replacement, recalculation of the building power load, phase-out, post-completion testing and issuance of WR1.
Details of the cases are availableCorporate profile: emergency repair performanceand24-hour Emergency Repairs。
OptionSociété d ' Entrepreneur, Inc.project photographs provide the most direct indication of workmanship. The following examples cover common non-compliances found in EMSD five-year inspections and important aspects of pump system installation:
For a complete list seeFixed five-year check-ups are often not in line with standard projects、Contrary to electrical engineering qualityandWater pump for engineering quality。
Beginning of the old building to the roofMaintenance of the building electricityElectrical rising mains and main switchboard replacement, water pump system maintenance.
Commercial Electricity ProjectNon-office time is generally arranged or the sub-district is suspended.
Engineering Electricity ProjectYat Full is based on Kwai Chung Industrial District.
Yat Full was trained in the construction of an additional school and in the Government Hospital ' s Electricity Project at the beginning of the establishmentSchool Electricity ProjectLeave construction arrangements.
「ServicesDescribe the content of various engineering services, statutory requirements and the applicable client; the copper display displays a logbook of electricity, water pump, CCTV and solar energy systems to facilitate client reference to the construction quality.
Yat Full has been established since 2002 and has been dedicated to building electrical system repairs (WR2) and water pump control systems for five years, and has so far been repaired to more than five hundred buildings, of which more than seventy have been replaced with electrical rising mains and building main switchboards.
The electricity system, the water pump system and the solar energy system are booked with an engineering photograph of Yat Full; the CCTV page is presented from a free graphic to serve as a service announcement, which is indicated on the page.
For example, the completeness of the barrier in the appliance appliances in the appliance appliances, the properness of the electrical circuits, the tunnel and the circuit circuits, the presence of the circuits, the presence of the appliances, the removal of discarded devices and the completeness of the appliances, as detailed on this page.Same sample work case。
Cable. 3165 8142 or e-mail ip@yat-full.com, Yat Full will arrange a site inspection and provide an itemised quotation. We focus on electrical and pump projects valued at up to HK$2 million.
Knowledge of the content of services, statutory requirements and cooperative processes for each project

WR2 Electricity Inspection, electrical rising mains replacement, building main switchboard replacement and refurbishment of the electrical system.
For further information
Intelligent digital water pump control system installation, water pump system maintenance and maintenance.
For further information
The power park, main switchboard fault, pump breakdown, within two hours.
For further information
Owners’ Corporation and property management electricity and water pump maintenance contract, engineering tender support.
For further informationWR2 Electricity Inspection, electrical rising mains and main switchboard replacement, water pump control system, CCTV and solar energy — electricity 3165 8142 or filing search forms for quotations.