Electrical and Pump Engineering for Property Management

Service Owners’ Corporation and property management — stability, transparency, long-term cooperation and direct tenders from 2002 to 7 years

Owners’ Corporation and property management building  Electricity and water pump

Electrical and plumbing engineering support for Owners’ Corporation and property management

Yat Full has worked with numerous building contractors to inspect, test and maintain electrical installations. Since early 2007, we have tendered directly for customers. As a small engineering company, we reduce unnecessary costs and offer competitively priced work, particularly Owners’ Corporation projects valued at up to HK$2 million.

We understand that property management focuses on security compliance, budget control and traceable maintenance records, and Yat Full can serve as a long-term reliable engineering partner for property management, in conjunction with regular inspections, water pump and power maintenance team services, as well as rapid response to emergency accidents. To date, Yat fully has maintained nearly five hundred buildings, of which more than seventy buildings have been built together with rising electrical mains and building main switchboards.

Target audience

  • Owners’ Corporation and Management Committee
  • Property Management Corporation and roof management services
  • Public title manager
  • Business building, industrial building and school owners
  • Owners’ Corporation, old building owner

Owners’ Corporation and property management: three matters of greatest concern

Security compliance

Building public power installations are subject to periodic inspection and testing in accordance with the Electricity (Travel) Regulations; procurement is subject to the Building Property Management Regulations and Code of Practice

Budget control

The cost of the work is shared by all owners, and the price is clearly sub-critical to facilitate comparison and handover to the owner

Tracing records

Maintenance records, WR1/WR2 certificates, incident reports are prepared to facilitate management, audit and future engineering planning

Electrical and plumbing engineering services available for property management and Owners’ Corporation

Maintenance of the daily power system, WR2 power inspection integrated, to electrical rising mains replacement, building main switchboard replacement and water pump system maintenance

Electricity and water pump fixed-term maintenance contract

It is the responsibility of the Maintenance and Maintenance Unit, which was set up in 2002 and is responsible for the regular inspection of cables, main switchboards, public circuits and water pump systems, and for the early detection of hazards.Maintenance contract content。

WR2 Integrated Electricity Inspection

To assist Owners’ Corporation in retrospecting the last WR2, handling the Electrical and Mechanical Services Department reminder, arranging inspection tests and power breaks, as well as issuing and adding the certificate of proof, for details.WR2 Inspections。

Electric rising mains and main switchboard replacement

The core works for the renovation of the power system in the old building can be planned together to reduce the number of power cuts.Rising Mains ReplacementandSwitchboard Replacement。

Water pump system maintenance and control system update

Intelligent digital water pump control system installation and replacement of the old control discrepancy, the fault is an immediate indication of the reasons for the reduction of household water park complaints.Pump System Engineering。

emergency repair and accident report

Twenty-four hours of maintenance, commitment to stay within two hours; afterwards, Owners’ Corporation or property management, the cause of the accident and the processing report are detailed.24-hour Emergency Repairs。

Planned power-free coordination

Assisting property management in informing affected households and tenants, liaising with suppliers of landing machines, security and fire-fighting systems, and coordinating power company power terminals and recharge arrangements as needed.

CCTV and solar energy extension

The construction of the CCTV monitoring system and solar energy power plants can be built in conjunction with the electrical works.CCTV SystemsandSolar Systems。

building Electricity and water pump maintenance contract

The regular maintenance of fixed-power installations would help ensure the reliability of electricity supply, prevent electrical accidents and protect the property industry; if electrical installations were not properly maintained, there was a risk of an electrical accident, subsequent maintenance costs could be higher than regular maintenance, and owners might be subject to third-party claims. Yat Full has been established to maintain a repair and maintenance team, dedicated to building water pump systems and electricity systems since 2000.

Scope of maintenance of the electrical system

  • Cable door locking, water prevention, ventilation and terrain clean-up
  • main switchboard and branch cable receptacle receptacle, direction lamp and protection devices
  • Equivalent cable barriers, capboards and electrographs
  • Public corridors, stairs and cantons lighted back
  • Electricity lines for public utilities such as elevation machines, water pumps
  • Terrestrial terminals and protection mentors

Water pump range of system maintenance

  • intelligent digital pump control panel operation and fault affix
  • Water sense, pressure switching and automatic switching
  • Water pump Electricity performance, heterosity and shock

Maintenance records and reports

Each inspection record the status of equipment and recommended follow-up matters, facilitate property management archiving and reporting to Owners’ Corporation, and can serve as a later date Five-year electricity examinationandRenovation of the electricity systemReference to planning.

Building Electricity System Maintenance - Electrical kitchens and main switchboard periodic inspections

Owners’ Corporation and property management building Statutory responsibility for electrical installations

Who is the owner of a public power facility?

Public-use power installations include general switch cables, circuit platings, electrical rising mains, and utilities such as lift machines, water pumps, public lights. Owners’ Corporation and the property management company where the building is built; if there is no Owners’ Corporation, the owner includes all unit owners, tenants and tenants, and the owner of the fixed electrical installations is responsible for ensuring the safety of the electrical installations.

WR2 Periodic examination of electrical installations

  • General building Permits more than 100 tranquillities, factories or industrial sites for more than 200 tranquillities, subject toA minimum of five yearsInspection, testing and receipt of WR2 certificates
  • Hotels, hospitals, schools, early childhood centres, etc., are subject to screening every five years, regardless of their load.
  • Public entertainment sites, places where dangerous goods are manufactured or stored and high-pressure devices are requiredAnnualInspection
  • The registered electrical contractor must issue WR2 within one month of testing. The owner must submit it for endorsement within two weeks of issue. The fee is HK$695 per application.
  • Electrical and Mechanical Services Department sends letters to the owner before the certificate expires; Electrical and Mechanical Services Department personnel also regularly inspect the building and take law enforcement action

Electricity works can be performed only by registered persons

All contractors engaged in fixed-power installations are required to register with the Electrical and Mechanical Services Department as registered electrical contractor and to employ registered electrical worker for electrical work, which is subject to testing and the issuance of a certificate of completion prior to appliance (WR1) after the completion of the new installation, assembly, modification or maintenance of the electrical installations.

Record-keeping

Owners’ Corporation and property management are advised to centralize WR1, WR2, maintenance records and accident reports for ease of reference.WR2 Frequent problems of electricity inspectionandWR1 and statutory questions and answers。

Owners’ Corporation procurement of electrical works: tendering for building property management regulations

The following is codified in accordance with chapter X of the architectural property management regulations (chap. 344) of the General Administration of Civil Affairs. Owners’ Corporation is required to comply with the Code of Conduct on Procurement of Supply, Goods and Services (in force since 13 July 2002, when making procurement and tendering).

Category 1 large procurement

The procurement value exceeds (or is likely to exceed) $200,000 and is not covered by category 2 large purchases or major maintenance works.

Category 2 bulk procurement

The value of the procurement exceeds (or is likely to exceed) 20 per cent of the average annual cost of building over the last three fiscal years (the caveat) rather than the procurement for major maintenance works.

Procurement of major maintenance works

The purpose of the procurement is primarily to repair, replace, maintain or improve the public utility of buildings, while the value of the procurement exceeds or is likely to exceed $30,000 in addition to the total number of building units (generally no parking spaces); and does not include clean, security or property management services.

Common provisions for three types of procurement

  • Be consistent with the Code of Practice andPurchase commitmentsAcquisition of goods or services
  • The text of the solicitation must clearly specify the nature of the goods or services, and be displayed in the eyes
  • No proposal submitted after the date of entry shall be admitted
  • Compliance with the declaration of interests in schedule 6B

Number of vendors invited to bid

  • Purchase value exceeds $10,000 but not more than $200,000: to a minimum3Award of tenders by potential suppliers
  • Purchase value exceeds $200,000: to a minimum5Award of tenders by potential suppliers

RESOLUTION ADOPTED BY THE GENERAL ASSEMBLY

  • Procurement for large volumes of procurement or major maintenance works: by Owners’ Corporation at the main assemblyOver half of the votesAdoption of a resolution deciding whether to adopt a proposal
  • Procurement for major maintenance works: resolutions are also required5 per cent or 100 ownersFirst-hand voting threshold (with less) and meeting procedures in schedule 6C

Renewal of immunity of current vendors

In the case of bulk purchases in categories 1 and 2, the same type of service was provided to the suppliers who were being hired by Owners’ Corporation at that time, and the owner ' s General Assembly resolution decided not to procure and specify provisions by tender, exempted from the request for proposals, but were subject to a declaration of interest.No exemptionThe tender is required.

declaration of interest and preservation of documentation

  • The participants in the Commission and the head of the procurement authority are required to make a declaration on the stakes and customs of the tenders.
  • Participants in the Board who make a declaration of interest shall not participate in the evaluation or negotiation of proposals
  • Procurement documents (bidding documents, contracts, accounts, invoices, etc.) shall be kept for at least six years

The contract should not be separated

Owners’ Corporation should not disaggregate a procurement into a smaller contract of several amounts to avoid statutory procurement requirements, and failure to comply with the necessary requirements may affect the validity of the procurement contract, and the contracting party may be subject to individual legal responsibility.

Property Management Corporation licensing system

Property management, which provides more than one category of property management services to the public property industry under the Property Management Services Ordinance (Cap. 626), is implemented as from 1 August 2002; the Property Management Authority also makes good operational guidelines for licensee customers to procure and prevent perimeters.

The above information is intended solely for general reference and is not a legal opinion. Owners’ Corporation shall be subject to the latest guidelines of the General Administration of Civil Affairs, the Code of Practice and the original texts of the regulations, and, if necessary, independent legal advice.

Owners’ Corporation tender for electricity engineering — electrical rising mains and building main switchboard replacement

Yat Full How to cooperate with Owners’ Corporation in tendering and tendering

Yat Full has started direct tendering for customer service at the beginning of 2002-07 and is familiar with the Owners’ Corporation and property management bidding process, which is designed to facilitate Owners’ Corporation ' s comparison of bids and delivery to owners.

Clear sub-quotations

  • Items, specifications and quantities by sub-item of the project
  • Deficiencies are identified to facilitate Owners’ Corporation ' s treatment by budget tranches
  • Description of the scope of the construction, power-free arrangements and projected duration of work
  • Listing of documents provided after completion, such as WR1 certificates and test records

Size of suitable works

Yat Full focuses on small electrical and pump projects valued at up to HK$2 million, including WR2 defect rectification, electrical rising mains replacement, main switchboard replacement andMaintenance of public power systemsThe water pump control system is upgraded to the real size of most single residential, commercial and industrial building.

Recalculation of power systems for each building

Yat Full will recalculate the electricity system for each client, seeking to be accurate and to ensure that every building has access to regular and safe electricity, avoiding excessively waste budgets or the need for re-engineering after a few days.

Cooperation process with Yat Full

Upon completion of the work or maintenance schedule, a clear proposal is provided for on-site information and budget.

1. Understanding needs

Electricity 3165 8142 or e-mail ip@yat-full.comProvision of information on building, last WR2, OECS reminders and existing issues.

2. On-site assessment

Visits to cable houses, electrical floors, kitchens and public places to record the status of equipment and to calculate the power load.

3. quotations and entry

Provision of sub-quotations or tendering as required by Owners’ Corporation solicitation documents.

4. Owners’ Corporation resolution

Owners’ Corporation determines whether or not to adopt a tender by the Commission or the Assembly of Owners, by procurement category.

5. Construction and testing

Coordination of power cuts and circulars, schedule of work, post-completion inspection tests and issuance of WR1.

6. Follow-up and maintenance

Completed reports are submitted and are available on a regular basisElectricity system maintenanceand water pump maintenance.

Residential huts, commerce, artisans and school works

Housing building and huts

In conjunction with Owners’ Corporation ' s budget and master ' s conference scheduleMaintenance of the building electricityWR2 inspection and electrical rising mains replacement, and early notification of occupancy arrangements.

Business building

Commercial Electricity ProjectThe focus will be on reducing the impact on tenant operations and generalizing non-office time or sub-sector power cuts.

Industrial building

Engineering Electricity ProjectThe burden is high and requires pre-coordinated tenant parking and re-commencement; Yat Full is based on Kwai Chung industrial area.

Schools and institutions

School Electricity ProjectLeave is normally arranged; schools are required to perform WR2 inspections every five years, regardless of the carrying amount.

Why Owners’ Corporation and property management selectivity Yat Full

Start 2007

Direct tenders are Owners’ Corporation and property management services, prices are transparent and no middle contractor bracket

500+

Nearly five hundred buildings building electricity and water pump system maintenance experience, and more than seventy completed electrical rising mains and main switchboard replacement

Start 2010

Establishment of a repair and maintenance team dedicated to building water pump systems and electricity systems

2 hours

24-hour maintenance, commitment to reach the site within two hours

Electricity + water pump

The same team handles electricity and water pump works, reducing coordination and redundancy of power park

500+ suite

Intelligent digital water pump system exceeding five hundred sets, no bad record has yet been maintained

Owners’ Corporation and property management .

Would Owners’ Corporation engage electricity engineering companies to tender?

Under the Building Property Management Regulations, such as procurement under category 1 large purchases (valued over $200,000), category 2 large purchases (valued over 20 per cent of the average annual cost of building over the last three financial years) or major maintenance works procurement (mainly related to repair, replacement, maintenance or improvement of the public utility component, with an average unit exceeding $30,000), Owners’ Corporation must be conducted by tender and in conformity with the Supply, Goods, Goods and Services Procurement Code.

Owners’ Corporation is invited to bid more than a few companies?

The procurement value exceeds $10,000, but not more than $200,000, and tenders must be issued to at least three potential suppliers; the value of the procurement exceeds $200,000, and tenders must be issued to at least five potential suppliers.

What works need to be adopted by the Owners General Assembly?

Procurement under category 2 bulk purchases or major maintenance works shall be subject to a resolution adopted by Owners’ Corporation, by a majority vote at the main assembly, to decide whether to adopt tenders; in the case of procurement for major maintenance works, the relevant resolutions shall also reach the threshold of 5 per cent or 100 owners (subject to a small number of persons) and adhere to schedule 6C meeting procedures.

Who is responsible for building WR2 of the power plant?

Owners of fixed electrical installations are responsible for periodic inspection and testing. Owners may include individual unit owners, property management companies and Owners’ Corporations. Installations in ordinary buildings with an approved loading exceeding 100 amperes require inspection, testing and a WR2 certificate at least every five years. SeeWR2 Inspections。

Yat Full can provide building electricity and water pump maintenance contracts?

Yat Full has, since 2002, set up a repair and maintenance team, dedicated to the maintenance of the water pump system and the electricity system, with regular maintenance arrangements as required by the building and in conjunction with emergency repairs and post-accident follow-up reports.

What is the ceiling on the size of the undertaking?

As a small engineering company, Yat Full minimises unnecessary costs and focuses on competitively priced electrical and pump projects valued at up to HK$2 million.

How long do Owners’ Corporation maintain its procurement documents?

Owners’ Corporation is required to maintain all procurement documents, including solicitation documents, contractual documents, accounts and invoices, for at least six years; and declarations on procurement made by participants and heads of the Board for up to six years after the date on which the contract was concluded.

Can large works be broken down to avoid tendering?

Owners’ Corporation should not, in general, disaggregate a procurement into a multi-value contract to avoid statutory procurement requirements; in the relevant legal procedures, the Tribunal would consider whether the contract was split to circumvent the provision.

Owners’ Corporation or property management requires long-term reliable electrical and plumbing engineering partners?

WR2 Electricity Inspection, electrical rising mains and main switchboard replacement, Electricity and Water pump maintenance contract - Electricity 3165 8142 or e-mail ip@yat-full.com pre-contract assessment.

↑